Wednesday 27 July 2011

Hat Trick!

It's done! The roof is finished and the internals are now underway with the plumbing and inital electrical works pretty much done by the looks of it. I'll let the photo's do the talking.













Also, I sorted out with the telecom fella's to upgrade the setup going into the house so that it was more like what I wanted to do after the house was finished. Apparently it's cheaper to do it whilst it's being built (I thought climbing in ceilings was fun though?!). So intead of the original 2 data points at the TV's and a phone point, now there will be 1 data point to each bedroom, 1 to the TV's in the Living and Home Theatre rooms each and one in the Dining where the phone point was originally, plus a wireless router in the Garage. And to top it all off, it was all done in conduit, so double points shouldn't be too hard to upgrade to later if I so desire!

Monday 11 July 2011

Time for an update

Well a small update folks. I sent off another progress payment thingo today, and as soon as I had, I got a phone call from HBC saying they know I'm pretty on top of it but that they'd sent on out (to which I replied it was already done again ::lol:: ). Anyways, they had also had a phonecall from my cabinet maker saying that the benchtop selection I'd made for the kitchen was having problems at the manufacturing level and that they wouldn't be able to warrant it if they released it in the state it was coming out in, so allowed me to reselect another colour, which I did 15 minutes later. Have changed from the Peral Silver to Satin Silver. Slightly less metallic look, but still a shiny, straighter pattern on it (which will match the floors better in my opinion!).

To also make the day a little better, I'd seen the plumbers at the house earlier in passing, but stopped in and had a chat with them on the way back here, and found them looking at the shower head attachement in my ensuite. Perfect timing! I'd thought about this a cppl of weeks ago at work, wondering if it would be too close to the wall (which it was where they had it positioned), and they too were considering calling the office to ask if they could move it out some more (500mm instead of 300mm from the wall). Pretty much just said, "Do it!" It was the first one they'd ever done too, so was a small learning curve for them. Once again, one of those things you don't normally see in a HBC house. ::lol::

The Top Hat (see Roof) should be going on tomorrow and I imagine the electrical might be done by then too. FULL STEAM AHEAD!!!!

Pic's of the roof framework for ya's!








 And a pic of the cool wine glasses I picked up in Augusta;